I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?
Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).
hang on everybody, call off the engineers, someone on the internet has thought about this for 2 minutes. good boy.